Phase IV:
Construction
From Drawings to Reality
From Drawings to Reality
In Texas, a brackish groundwater desalination project may be constructed through a variety of project delivery methods. Regardless of the procurement method used, successful construction depends largely upon the level of experience held by the project engineers and contractors and the degree to which they partner with the owner.
Chapter Outline:
Bidding and Procurement
Traditional Design-Bid-Build Approach
Variations of Design-Build
Hybrid Design-Build Approach
Construction Considerations
Documentation
Construction Management
Download PDF (409 KB) for contents of entire chapter (9 pages).